My PLM Journey: CPC to PDM to PLM (2001 to till date)
Back to basics. Found this from my post graduation (Masters in “Computer Integrated Manufacturing“) class notes way back in 2001 to 2003. I liked the Windchill 4.0 foundation and PDM guide through Windchill 5.0 and so on. I used it…